We believe transparency is the foundation of a reliable partnership. As a subsidiary of Votorantim Cimentos, we manage our logistics through the Industrial Management pillar of the Votorantim Cimentos Production System (VCPS), ensuring our calculations remain fair and data-driven. We never hide behind complex fees; we believe in showing you exactly how we calculate our surcharges to keep your project moving:
Materials Fuel Surcharge
We apply a surcharge to the material cost based on the current market price of diesel. This is calculated by monitoring the weekly average price of fuel and applying a percentage-based adjustment to the base material rate once it exceeds our established baseline. This ensures we can keep our pits running and our supply chain moving even during periods of high market volatility, so your project never has to wait for materials.
Delivery Fuel Surcharge
The delivery surcharge is calculated separately from the material cost to account for the logistics of our fleet. We use a formula that factors in the travel distance and the fuel consumed per load. This granular approach ensures you are only paying for the specific energy required to get your aggregates from our plants to your site.
Safety and Health are not just on a checklist at CBM; they are our first and most important principle. We put the health of our people and our neighbours before any result, which is why we provide comprehensive CBM aggregate safety data sheets for every material we manufacture. These guides are essential for the safe and effective use of our products, outlining critical information on hazard identification and exposure controls.
We follow world-class industrial standards to ensure you have the exact toxicological and regulatory data needed to maintain a safe job site for your crew. Use the resources below to access technical data for our limestone, sand, gravel, and concrete solutions.